GUIDE · ELECTRICAL PRICE BOOK

Electrical Price Book
for a Solo Electrician

A flat-rate electrical book has one row per repeat job, each priced from your own labor rate and parts markup. Here is how the rows are built for the work a one-person electrical shop repeats most.

FREE TO READ · ILLUSTRATIVE NUMBERS, DEMO DATA ONLY · SAMPLE BOOK IN YOUR BROWSER

Key takeaways

  • Each repeat job is one row: labor hours times your labor rate, plus parts times your markup, rounded up.
  • The worked rows below use illustrative inputs of $95 an hour, a 30% parts markup, and rounding up to the next $5.
  • Group the rows the way electrical work actually comes in, not in the order a catalog lists them.
  • Keep the big custom jobs out of the template. Quote them by hand from the same rate.

How a Electrical Price Book Is Structured

A usable electrical book groups rows into Service Calls, Outlets & Switches, Lighting, Panels & Breakers, Fans & Fixtures, and EV & Special. Each row needs a plain job name, a typical labor-hour figure, a mid-grade parts cost, and one line saying what the price covers. The price itself is not typed in. It is calculated from your three numbers, so a change to your rate moves every row at once.

Worked Example Rows

These rows use made-up but consistent inputs so you can check the arithmetic: labor hours times $95, plus parts times 1.30, rounded up to the next $5. The hours and parts costs are illustrations of how a row is built, not survey data. Replace them with your own.

JobTypical hoursParts cost (example)Example price
Swap a standard GFCI receptacle, existing box0.75$22$100
Replace a ceiling fan on an existing ceiling box1.50$35$190
Replace a 120V light fixture, existing box1.00$18$120

Illustrative only. Take the first row: 0.75 hours at $95 is $71.25, and $22 of parts at 1.30 is $28.60. The sum is $99.85, which rounds up to $100.

Why the panel and EV rows are not in the first 15

Panel upgrades and EV charger installs depend on the service size, the permit, and the utility. Those are hand-priced jobs, so keep them as custom line items. Template them only after you have done the same job several times and know the typical hours.

Where to Start With Your First Fifteen Rows

Start with the jobs you ran most often last year. Pull them from invoices or from memory, template those first, and leave the rest as custom line items. Twenty accurate rows beat eighty rows you never finished setting up.

Common Mistakes

Copying a published price list. A downloaded list is a regional average, not your labor rate or your supplier costs. Use it for structure at most.

Rounding down. Round up, so you never absorb the difference on a job.

Never revisiting the numbers. Set a date each year to check your rate and markup against real costs, and adjust the whole book at once.

STRAIGHT ANSWERS

FAQ

Do I need software to build a electrical price book?

No. Paper or a spreadsheet works for your first fifteen or twenty rows. Software earns its keep once you maintain dozens of rows and update them often.

Where do the hours in the example rows come from?

They are illustrative inputs chosen so the arithmetic is easy to follow. They are not survey data. Replace them with hours from your own completed jobs.

Should a electrical book include the big jobs?

Only the repeat ones. Large or unusual jobs depend on the site, permits and parts, so price those by hand each time.

BUILD YOUR FIRST SAMPLE BOOK

Set your rate once.
Watch the rows price.

QuoteIron's free book builder reprices the whole sample book in your browser as you type your labor rate and markup. No signup, no card.